The given description details the methods that are used in Mixing Zinc Phosphate for Permanent Cementation,

The complete description contains the following details:

Personal protective equipment (PPE) is required for the healthcare team, and the student is required to identify and prepare the instrument setup.

Equipment and Supplies

  • • Glass slab (cool)
  • • Spatula (flexible stainless steel)
  • • Zinc phosphate powder and dispenser
  • • Zinc phosphate liquid and dropper
  • • 2 × 2-inch gauze pads

What is Cementation?

This refers to the use of cement to create a building structure that is used to keep things in place.

Hence, we can see that the Procedural Steps include:

Preparing the Mix

1. Dispense the powder toward one end of the slab and the liquid toward the opposite end.

2. Recap the containers.PURPOSE These materials can be affected by prolonged exposure to the humidity.

3. Divide the powder into small increments as directed by the manufacturer.

4. Incorporate each powder increment into the liquid.NOTE When increment sizes vary, smaller increments are used first. Mixing time per increment also varies; the time is approximately 15 to 20 seconds.

5. Spatulate the mix thoroughly, using broad strokes or a figure-8 movement over a large area of the slab.PURPOSE This aids in dissipating the heat generated during mixing.

6. Test material for appropriate cementation consistency. The cement should string up and break about 1 inch from the slab. Total mixing time is approximately 1 to 2 minutes