A hole drilled into a manufactured part is specified to have a diameter of 1.50 cm. Ten parts are sampled from a production run. The hole diameters of the parts range in size from 1.43 cm to 1.55 cm. Is the range of measurements a better indicator of the accuracy or precision of the drilling process? ____________