Perez, Inc. recently completed 40,000 units of a product that was expected to consume six pounds of direct material per finished unit. The standard price of the direct material was $7.50 per pound. If the firm purchased and consumed 246,000 pounds in manufacturing (cost = $1,881,000), the direct-material quantity variance would be (with steps)