A client is concerned that a power outage or disaster could impair the computer hardware's ability to function as designed. The client desires off-site backup hardware facilities that are fully configured and ready to operate within several hours. The client most likely should consider a
A. Cold site.
B. Cool site.
C. Warm site.
D. Hot site.