Respuesta :

znk

Answer:

[tex]\boxed{ \text{8 p.m.}}[/tex]

Step-by-step explanation:

First, we must plot the graph of your system of equations (see below).

The two lines cross at (12, 360).

Thus, machine A had been going for 12 h. It started at 8 a.m., so it ended at 8 p.m.

Both machines had made 360 ft of wire by [tex]\boxed{ \text{8 p.m.}}[/tex]

Check:

360 = 30 × 12     360 = 40(12 – 3)

360 = 360          360 = 40 × 9

                          360 = 360

OK.

Ver imagen znk