chaveli36171 chaveli36171 28-05-2024 Engineering contestada The U2 MSRs are fully in service at 100% power. In their normal alignment, the MSR drain tanks will drain to the #___ FW heaters and the Reheater Coil drain tanks will drain to the #___ FW heaters a) 4, 6 b) 5, 6 c) 6, 4 d) 6, 5