A machine operator at The Can Company stamps labels on sheets of metal that are later made into cans. Each sheet can make 118 cans. The cost per sheet of metal is $10.60. The operator is paid $9.40 per hour and stamps labels on 120 sheets per hour. What is the prime cost of labeling one can?