A storage bin of volume 10 m³ needs to be constructed with a square base and open top. The material for the base is thicker than the sides, costing 5€ per square meter. The material for the sides costs 4€ per square meter. Find the minimum cost to construct a box that meets these criteria. (Make sure to use at least three decimal points).