in the exhibit, the 2960 switches have been taken out of the box and cabled, and pc2 can communicate through r1 with the rest of the ip network. however, no configuration has been added to either sw1 or sw2. as a result, the network engineers sitting at a management station to the right of r1 cannot ping or telnet to sw2. which of the following configuration commands, when entered in the correct order on sw2, allow the network engineer to ping or telnet to sw2 from the management station?
each correct answer represent a complete solution. Choose all that apply. A. Interface vlan1
B. No Shutdown
C. Ip addres 10.1.1.200
D. Ip mask 255.255.255.0
E. Ip Adress 10.1.1.200.255.255.0
F. Ip default-gateway 10.1.1.254